Dongguan Haotian Testing Equipment Co., Ltd
Home>Products>Programmable large-scale alternating humid and hot environment temperature and humidity testing room
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    15899907907
  • Address
    Building 2, No. 25 Yuanxia Road, Changping Town, Dongguan City
Contact Now
Programmable large-scale alternating humid and hot environment temperature and humidity testing room
The programmable large-scale alternating humid and hot environment temperature and humidity test chamber and the alternating humid and hot chamber con
Product details

Application of walk-in large alternating humidity and heat test room:

The walk-in high and low temperature alternating humidity test chamber is used for heat and cold resistance testing of defense industry, aerospace industry, automation components, automotive parts, electronic and electrical components, plastics, chemical industry, pharmaceutical industry and related products.

Performance: The performance measured after being stable for 2 hours without test load or scaffolding. In addition, the temperature rise and fall time refers to the performance of air-cooled systems at room temperature+25 ℃ under no-load conditions




Intelligent operating system for alternating humidity and heat test room: (control system)

The controller operation interface is available in both Chinese and English, and the real-time operation curve chart can be displayed on the screen.

It has a capacity of 120 sets of programs, 12000 segments, and 999 loop steps, with a maximum time setting of 99 hours and 59 minutes per segment.

After inputting the data and experimental conditions, the controller has a screen lock function to avoid manual touch and shutdown.

It has the function of automatic calculation, which can immediately correct the temperature and humidity change conditions, making temperature and humidity control more accurate and stable.

Freezing and air circulation system.

The refrigeration unit adopts the original French 'Taikang' fully enclosed compressor.

The refrigeration system adopts a unit or binary low-temperature circuit system design.

Adopting a multi wing air supply fan for strong air circulation, avoiding any dead corners, can make the temperature and humidity distribution in the testing area uniform.

Haotian rice white large walk-in constant temperature and humidity test room physical picture:

Technical reference for alternating humidity and heat test room:

1. Temperature range:- 70℃~100℃.

2. Temperature fluctuation: ± 0.5 ℃

3. Temperature uniformity: ± 2.0 ℃

4. Heating time: from -70 ℃ to 120 ℃, less than 80 minutes (non-linear no-load)

5. Cooling time: from+20 ℃ to -40 ℃ for less than 70 minutes (non-linear no-load)

The temperature change rate is the air temperature change rate, not the product temperature change rate

6. Humidity range: 20%~98%R.H; Please refer to the temperature and humidity range chart.

7. Humidity fluctuation: ± 2.5% R.H

8. Humidity uniformity: ± 5.0% R.H

Laboratory structure: Removable on-site assembly structure

a. Studio size: customized according to requirements

Material of the board:

a. Studio size: customized according to requirements

In the W direction of the warehouse, a single door W80x H200CM is installed with a 450 × 300 × 40mm window on the door. The door opens outward, and the electrical control box is placed in the left front of the D direction. The freezer and air conditioning box are placed behind the electrical control box,

1. Warehouse board: a. Outer box material: color steel plate | polyurethane plate.

b. Inner box material: stainless steel plate (SUS # 304).

c. Insulation material: high-density PU hard foam.

d. Load bearing capacity of the storage board: 500g/㎡ (evenly distributed load)

2. Warehouse base, electrical control box and freezer: National standard angle iron+6 # channel steel+steel plate spray coating

3. Laboratory box door: single door (W80 x H200CM)

a) Material: Same as warehouse board

b) Handle: cylindrical handle

c) Rear button: SUS#304.

d) Window 450 × 300 × 40mm with three layers of vacuum

4. Supply air circulation system: a. Motor: 5 units of AC380V 2HP

b. Extend the axis

c. Fan: Multi blade fan (SIROCCO FAN)

d. Ceiling forced air circulation system

Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!