English

Hunan Tianzhuo Pipe Industry Co., Ltd
Home>Products>PE hot melt pipe fittings
Firm Information
  • Transaction Level
    VIP member
  • Contact
  • Phone
    151-1625-2091
  • Address
    No. 399 Chigang Road, Wangcheng Economic Development Zone, Changsha City, Hunan Province
Contact Now
PE hot melt pipe fittings
PE hot melt fittings are a general term for fittings connected by hot melt in PE fittings, including injection molded socket hot melt fittings, inject
Product details

PE hot melt fittings are a general term for fittings that are connected by hot melt in PE fittings, includingInjection molded socketheat fusionPipe fittingsInjection molding dockingheat fusionPipe fittingsWelding hot melt fittings, etc.

1. Injection molded socketheat fusionpipe fitting


Injection molded socketheat fusionpipe fittingSuitable for pipelines with diameters below Φ 110.
Attention should be paid during installation: 1. The hot melt equipment can only be operated when it reaches the set working temperature. 2. The cutting of pipe ends should be straight, neat, and clean. 3. The socket should reach the designated depth. Rotation is strictly prohibited.


PE承插管件






2Injection molding dockingheat fusionpipe fitting

Injection molding dockingheat fusionpipe fittingSuitable for pipes with a diameter of Φ 63 and above.

Attention should be paid during installation: 1. The temperature control of the hot melt welding machine should be precise. 2. The welding heating time, temperature, pressure, and holding and cooling time must comply with regulations. 3. During the insulation and cooling period, no external force shall be applied to the connecting parts.


对接管件


3Welding hot melt pipe fittings

Welded hot-melt fittings are generally usedSuitable for large-diameter pipelines, specifications without injection molded fittings, or fittings with special requirements.

Attention should be paid during installation: 1. The temperature control of the hot melt welding machine should be precise. 2. The welding heating time, temperature, pressure, and holding and cooling time must comply with regulations. 3. During the insulation and cooling period, no external force shall be applied to the connecting parts.

焊制管件




Online inquiry
  • Contacts
  • Company
  • Telephone
  • Email
  • WeChat
  • Verification Code
  • Message Content

Successful operation!

Successful operation!

Successful operation!