Aluminum alloy mini cylinder |
|
1、 Installation and use: 1. When the workload changes during work, cylinders with sufficient output force should be selected. Under high temperature conditions, corresponding high-temperature resistant cylinders should be selected. 2. Before piping the cylinder, it is necessary to remove debris from the pipe to prevent it from entering the cylinder. 3. The medium used in the cylinder should be filtered through a filter element of at least 40um before use. 4. In low temperature environments, Qing takes measures to prevent freezing of moisture in the system. 5. Cylinders should avoid lateral loads as much as possible during operation to maintain their normal operation and service life. 6. When removing the cylinder and not using it for a long time, attention should be paid to surface rust prevention, and dust blocking caps should be added to the intake and exhaust ports. 2、 Calculation method for theoretical output of cylinder:
2、 Theoretical output table of cylinder:
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
