
The fully automatic cardboard box packing machine is an intelligent fully automatic packing machine that uses a high-speed distribution device to package various containers, including plastic flat bottles, round bottles, irregular bottles, various sizes of glass bottles, round bottles, oval bottles, square cans, and paper cans. It is also suitable for packaging boxes with partitions. The bottle is clamped by a bottle clamp (with built-in rubber to prevent damage to the bottle body) and placed in an open cardboard box. When the gripper is lifted, the cardboard box is discharged and sent to the sealing machine, which is controlled by P.L.C and touch screen display. There is a bottle shortage alarm shutdown and a safety device for not packing without bottles. Greatly reducing production personnel and labor intensity is an essential equipment for automated scale production.
According to the packing requirements, it can automatically organize and arrange the products.
● Wide applicability and can be used for packaging various products.
Especially suitable for use with packaging assembly lines, easy to move.
Bottle, box, bag, and barrel series.
Service CommitmentService Promise
All products sold by Spark Packaging are genuine. If you have any questions, please contact our customer service personnel and we will communicate with you as soon as possible to handle them. We will strive to meet your maximum needs with the lowest price and best service.
Delivery, installation and commissioning period Delivery, installation and commissioning stage
Assign dedicated after-sales service personnel for free to arrive on-site and guide customers in installation and debugging.
Warranty period Warranty period
One year. Calculated from the date of self acceptance; During the warranty period, we are responsible for free replacement of all parts caused by quality or non natural wear and tear; All repairs during the warranty period, including those caused by natural wear and quality issues, are free of labor costs.
transport Transport
The transportation of goods and transportation safety shall be the responsibility of Party B, and the total contract price already includes the transportation insurance premium.
package Packing
Whole vehicle shipment, wooden pallets, wrapped film packaging.
Unloading and handling The unloading and handling
The second party is responsible for unloading, and the first party arranges personnel and forklifts to assist in unloading.
Installation and commissioning Installation and commissioning
1. The second party shall notify the first party in writing of the delivery date, expected arrival date, and preparations required by the first party before the equipment is shipped.
2. The installation personnel of Party B shall follow the equipment to the installation site of Party A for guidance on unloading, free equipment installation and commissioning, and training for Party A's operators.
3. The first party shall provide assistance to the second party for installation and debugging under existing conditions. The first party shall provide auxiliary tools to assist in installation and provide general tools.
4. The installation personnel of Party B shall strictly comply with the relevant regulations of Party A's factory during the installation period. If overtime is required, written consent from Party A shall be obtained.
Training and after-sales service Training and after sale service
1) The second party is responsible for the installation and debugging of the equipment, and provides training on operation and maintenance to the first party's operation and management personnel, ensuring that the first party's operators can independently and proficiently operate and maintain the equipment.
2) The first party purchases spare parts from the second party, and the second party arranges technical services when needed. The second party shall respond to the first party's request for service by phone or fax within 2 hours and dispatch qualified service personnel to the first party's equipment usage site within 96 hours.
technical standard Technical standard
1. Party B guarantees that the raw materials of the equipment specified in this contract comply with national standards, and guarantees quality and compliance with the process standards and parameters specified in the technical agreement. Party B shall provide a quality assurance certificate.
2. The equipment of Party B shall be strictly manufactured in accordance with the requirements stipulated in the technical agreement signed by both parties. If any party needs to make any changes, they must obtain the consent of the other party and provide a written form, with both parties signing and confirming.
3. Product manufacturing and installation standards: see technical agreement
TipsReminder
Due to frequent packaging changes of some products, the goods you receive may not be completely consistent with the pictures. Please refer to the actual product you receive, and we will try our best to update it in a timely manner. We apologize for any inconvenience caused and thank you!
packing list
Random accessories: 1 toolbox, 1 manual, 1 certificate of conformity, 1 large adjustable wrench, 1 open-end wrench 8-10/13-15, 17 each, 1 set of hexagonal wrenches, 1 main tension spring, 2 cutter tension springs, 2 cutter cover springs (angle edge machines KBG-50 and KBH-50 are not used), 1 fuse each (according to the actual installation on the equipment), and 1 photoelectric screwdriver.